From 12th June 2026, the Southbound platform at Tackley Railway Station for trains towards Oxford will be closed until 30th April 2027 for footbridge works.
Further details can be found in the following link:
https://www.nationalrail.co.uk/engineering-works/tackley-footbridge-closure-20260612